Question 2 :
Side slope of formation in embankment should be kept normally as
Question 3 :
The ballast underside of Glued insulated joints must not be less than_____mm
Question 4 :
Which of the following machine crushed ballast stack gets rejected for under size (Retention % on sieves given )
Question 5 :
Slope of the formation top ballast level for new works shall be
Question 6 :
The bed level of the side drain should be_____cm. below the formation level required for efficient drainage of cuttings and catch water drains
Question 7 :
Minimum ballast cushion under rail seat of a PRC sleeper is_____mm
Question 8 :
In ballast testing, the maximum value of water absorption test is _%
Question 9 :
Permitted shrinkage for wagon measurement of ballast, compared to stack measurement is ____%
Question 10 :
Sizes of square mesh sieves used for sieve analysis of ballast are ___mm
Question 11 :
Side slopes of ballast stack shall not be flatter then ------.
Question 12 :
The recommended minimum depth of ballast cushion for group- 'A' LWR BG track is ------mm.
Question 13 :
Minimum depth of cushion for Track Renewals (CTR and TSR ) all BG routes in MM
Question 14 :
Minimum depth of cushion all doubling, gauge conversion and new line construction works BG routes in MM
Question 15 :
Minimum depth of cushion for all loop lines BG routes in MM
Question 16 :
Minimum depth of cushion for all SWR track BG routes in MM
Question 17 :
Minimum depth of cushion for LWR track at time of institutions BG routes in MM
Question 18 :
Minimum depth of cushion for private Siding with permissible speed upto 50 kmph BG routes in MM
Question 19 :
Minimum depth of cushion for 25 Ton axle load rolling stock is nominated to run BG routes in MM
Question 20 :
Minimum depth of cushion for private Siding permissible speed more than 50 kmph BG routes in MM
Question 21 :
Percentage of retention of machine crushed stone ballast above 5% but does not exceed 10% on 65 mm sieve
Question 22 :
percentage of retention of machine crushed stone ballast maximum of 5% on 65mm sieve
Question 23 :
percentage of retention of machine crushed stone ballast between 60%( excluding) and 65%( including)on 40 mm sieve
Question 24 :
percentage of retention of machine crushed stone ballast exceeds 70% on 40mm sieve
Question 25 :
percentage of retention of machine crushed stone ballast above 10% on 65mm sieve.
Question 26 :
percentage of retention of machine crushed stone ballast less than 40% on 40mm sieve
Question 27 :
percentage of retention of machine crushed stone ballast more than 98%On 20mm sieve.
Question 28 :
The ballast required for maintenance purposes shall be established by assessing the quantity
Question 29 :
The ballast required for Deep screening purposes shall be estimated by
Question 30 :
A SR of ________ to be imposed for First train only, irrespective of infringement.
Question 32 :
do not allow any safety category staff who is due for___to work BT
Question 34 :
The challan shall be sent to the consignee along with ballast train where unloading is planned
Question 36 :
Formation slope for new works/ alterations to existing work is1 in___
Question 37 :
The recommended minimum widths of embankment for existing B.G. single line straight track is_____mm
Question 38 :
The recommended minimum widths of embankment for existing B.G. double line straight track is_____mm
Question 39 :
The recommended minimum widths of cutting for existing B.G. single line straight track is------mm
Question 40 :
The recommended minimum widths of cutting for existing B.G double line straight track is------mm
Question 41 :
The recommended minimum widths of embankment for B.G. single line new work staight track is------mm
Question 42 :
The recommended minimum widths of embankment for B.G. double line New work staight track is------mm
Question 43 :
The recommended minimum widths of cutting for B.G. single line new work staight track in mm
Question 44 :
The recommended minimum widths of cutting for B.G. double line New work staight track is------mm
Question 45 :
The minimum widths of cess in formation in new works for PSC sleeper with 300mm cushion is
Question 46 :
Portion at top of formation level, extends from toe of ballast to edge of formation is called
Question 48 :
For space more than 6.1m, rail should preferably be provided at ______of span from either end.
Question 49 :
The top table of guard rail should not be lower than that of the running rail by more than _____mm.
Question 50 :
At the bridge approaches, for a length of about____mtrs. the width of cess should be____cm clear of full ballast section.
Question 51 :
In other than LWR Permissible amount of creep on BG track
Question 52 :
While doing through packing of track, ballast is opened out upto the end of sleeper and on inside it is_____from the rail seat for BG
Question 53 :
Gauge tolerance for BG on straight track a measurement in floating condition.
Question 54 :
In Deep screening of track the speed is relaxed in ...... days if track is packed manually.
Question 55 :
In Deep screening of track normal speed is restored in .....days if the track is packed mechanically.
Question 56 :
During packing.......... rail shall be treated as base rails on curves
Question 60 :
There shall be atleast........ fully supported sleeper while tackling the next sleeper for Deep screening
Question 62 :
On curves ____ rail shall be taken as sighting rail for slewing.
Question 63 :
At the beginning of the gang beat____no. of rail sample track should be maintained
Question 64 :
The entire track must be Deep screened at least once in___years.
Question 65 :
The work of deep screening shall be done at the speed restriction of ____kmph if done amnually
Question 66 :
Lubrication of fish planted joints shall be done preferably in the month of.
Question 69 :
Lifting shall be always be commenced in the direction of___ grade of single line.
Question 70 :
On BG shallow screening shall be done for LWR/CWR when rail temp is below
Question 71 :
minimum length of permanent closure in running line where speed is above 100 kmph other than LWR
Question 72 :
Gauge tolerance for curved with radius 440 mts or more for BG is permitted is for a period
Question 73 :
Gauge tolerance for curved with radius 440 mts or more for BG is permitted upto in floating condition.
Question 74 :
In annual programme of regular track maintenance of post monsoon attention is for a period of about of____months after the end of mansoon
Question 75 :
ESC greasing is non corrosion area shall be done once in
Question 78 :
While doing shallow screening, In machine maintained section........ depth of crib ballast shall be opened out below the bottom of sleeper
Question 80 :
Creep in excess of......... mm shall not be permitted in other than LWR.
Question 82 :
Where buckling is anticipated or actual buckle takes place, patrolmen shall frist
Question 83 :
For inservice rails anti corrosive painting shall be done to a thickness of
Question 85 :
In track circuited areas minimum ballast resistance per km of track should not be less than________in station yards
Question 86 :
In track circuited areas minimum ballast resistance per km of track should not be less than_____ in mid section.
Question 87 :
P.way staff are advised to keep clear of the track to avoid contact with rails when electrically hauled train is within
Question 88 :
In electrified territory no tool or any part of the body of the workers should come within the_____ of danger zone. here danger zone means
Question 90 :
during lifting work before passing a train ensure ramp of __mm per rail
Question 94 :
Important track parameters to chack and attend for safe running of trains are
Question 100 :
The interval between two coats of anti corrosion painting shall be minimum