Question 2 :
In anti corrosive painting of rails, thickness of paint is measured in
Question 3 :
Generally more corrosion can be found at______ location on the rail
Question 10 :
how many rounds of manual packing are required to relax Speed to normal after manual deep screening.
Question 11 :
When 3 rounds of machine packing done after manual deep screening speed can be relaxed to normal after
Question 13 :
The clear distance between two sleepers on bridge should not be more than
Question 14 :
The clear distance between joint sleeper on bridges should not be more than
Question 16 :
In PSC minimum insulated liners to be ensured in track circuited area
Question 17 :
Unserviceable material not fit for use, ends to be painted with
Question 18 :
Unserviceable material not fit for use, ends to be painted with
Question 19 :
After emergency repairs to a weld/ rail failure, trains can be passed at 20kmph by railway official of rank not less 6
Question 20 :
After the day's work the tools of the gang must be locked in tool box and can be placed at_____ making it easy to get them back quickly for next days work.
Question 21 :
Who is responsible for the safe custody of tools issued for the gang?
Question 22 :
During floods, Pwl after walking over and probing the BG track, passenger train may be permitted to pass when the depth of water above rail level dose not exceed.....
Question 23 :
During floods, Pwl after walking over and probing the BG track, passenger train may be permitted to pass when the depth of water above rail level dose not exceed.....
Question 24 :
When multiple track machine are required to go into the block section, all of them must be moved at _____ speed so as to reach the work site quickly.
Question 25 :
When material train is programmed to go into the block section and return to the station where from it started, ______ shall be issued.
Question 26 :
When material train is programmed to go into the block section and then proceed further to the next block station,_____ shall be issued.
Question 27 :
When track machine is programmed to go into the block section and return to the station where from it started, _____ shall be issued.
Question 28 :
When track machine is programmed to go into the block section and then proceed further to the next block station,______ shall be issued.
Question 30 :
The minimum distance between two track machines while going into the block section is ____
Question 31 :
PWI shall inspect the permanent way gauges, flags, single lamps, tools etc supplied to gangs atleast_____
Question 32 :
Making use of_____ for propulsion of trollies or lorries is strictly prohibited.
Question 33 :
Maximum number of men that may be carried on a push trolley shall not exceed_____
Question 34 :
Motor trolley shall be in all cases be manned by not less than____ trolley men.
Question 35 :
The official in charge of the trolley, lorry or motor trolley shall also be in possession of a ____ in addition to the prescribed equipment.
Question 39 :
Official authorized to issue competency certificate to use motor trolley is _____
Question 40 :
Motor trolley may be allowed to follow a Mail/Express train (true/false)
Question 41 :
The person in-charge of a trolley/lorry should have the insulation of his trolley tested and certified once in every_____ months by an Inspector of the S&T department.
Question 42 :
No private trolley shall be used by non-railway official except under special permission of_____
Question 43 :
Official authorized to issue competency certificate to use rail dolly is ___
Question 44 :
Rail dollies shall not be worked on sections having gradients steeper than ___
Question 45 :
Whenever a trolley is not use, it shall be locked and placed____,
Question 46 :
When working near LC gate, the person in charge for the working of rail dolly shall be ____
Question 47 :
The minimum clear visibility distance required to work a lorry without block Protection is ___
Question 48 :
After push trolley inspection, the trolley can be brought back to PWI HQ by attaching to ____
Question 49 :
In through packing, ballast should be opened out on either side of rail seat to a depth of
Question 50 :
Gauge tolerance in maintenance for B.G on Straight track _______ in floating condition
Question 51 :
Gauge tolerances in maintenance for B.G new track on curves with radius more than 350mm _____
Question 52 :
Gauge tolerances in maintenance for B.G on curves with radius less than 350mm_____
Question 53 :
Raidge of ballast in the centre of track should be with in...........
Question 54 :
During packing............. rail shall be treated as base rail on curves
Question 55 :
Base rail shall be packed upto........ rails length before correction of cross level
Question 56 :
Over package sleepers near the rail joint may be result into .........
Question 58 :
While viewing, crow bar shall be planted in ballast at an angle not more than......
Question 59 :
If the level of the joint is above the rail level it is called
Question 60 :
In Deep screening of track, a group of......... sleepers are tackled at a time
Question 61 :
In Deep screening of track the normal speed is restored in.......... days, if the track is packed manually.
Question 62 :
In Deep screening of track the normal speed is restored in.......... days, if the track is deep screened by BCM and packed with tamping machines and followed by DTS
Question 64 :
The entire track must be Deep screened at least once in....... year or .....GMT whichever is 6
Question 65 :
Work of deep screening shall be done by manually with the speed restriction of minimum......... kmph
Question 68 :
Lifting of track shall always be commenced in the direction of........ grade on single line
Question 69 :
lowering of track shall always be commenced in the direction of........ grade on single line
Question 70 :
Lifting of track shall be done in the....... on double line
Question 71 :
Lifting of track shall be carried out under minimum supervision of.....
Question 72 :
Lowering of track shall be carried out under minimum supervision of.........
Question 73 :
While working a push trolley, the protection should be done in case view not clear for a distance of...... on BG
Question 74 :
Minimum distance between two or more push trolley running together on the same line
Question 76 :
Not more than....... rail dolleys should be worked in a group in any one block section
Question 77 :
While working with rail drolly in block protection should be done in case view and clear for a distance of_____on BG
Question 78 :
While working with rail drolly in block protection should be done in case view and clear for a distance of_____on BG
Question 79 :
The person in charge for the working of rail dolleys shall be a railway servant not lower in rank____
Question 80 :
Lorries should be removed clear of the main line or if within station limits.of the line on which a train is to run, at least____ before the train is due.
Question 81 :
Lorries should be removed clear of the main line or if within station limits.of the line on which a train is to run, at least____ before the train is due.
Question 82 :
In annual maintenance program of PRC track___ duration for Pre monsoon attention.
Question 83 :
In annual maintenance program of PRC track___ duration for Pre monsoon attention.
Question 84 :
In annual maintenance program of PRC track....... duration for post-monsoon attention
Question 85 :
In annual maintenance program of PRC track....... duration for monsoon attention
Question 86 :
International tracks on triple or multiple lines, Engineering indicators shall be fixed between tracks to within................mm from rail level.
Question 87 :
Indicators shall be placed on the........... side as seen by the Drivers except on CTC sections (Single line)
Question 90 :
The bottom most parts of Caution Indicator, Speed Indicator should be......mm above R.L
Question 91 :
The bottom most parts of T/P & T/G should be .....mm above R.L
Question 92 :
In case of Stop dead restrictions stop indicator shall be provided at.......
Question 93 :
In case of Speed restrictions speed Indicator shall be provided at....... m
Question 94 :
20 kmph caution order is prevailing at a deep screening spot. The caution indicator board should be fixed at a distance of______ meters from the work spot as per IRPWM
Question 96 :
Slewing of track shall be directed by the mate who on straight should sight the rail from a distance of............. meters.
Question 98 :
While doing shallow screening/over hauling the depth of shoulder ballast to be scanned below the sleeper level is -------
Question 99 :
While doing sealing of liner contact area the location to be sealed--------
Question 100 :
Lifting shall be done always in the------ direction of traffic in double line and start from end in single line