Question 1 :
While doing boxing the shoulder ballast to be heaped up with the___
Question 2 :
In PSC track the number of galas to be given for track maintainer while attending through packing work is____
Question 3 :
As a maintenance practice side drains, catch water drains and bradiges to be cleaned in___
Question 4 :
Lubrication of rail joints to be completed in the annual maintenance period of
Question 7 :
when rail/weld failure occurs the emergency repairs to be done by____
Question 8 :
when rail/weld failure occurs the emergency repairs to be done by____
Question 9 :
k
Key man can pass the train in case of rail breakage, when gap is_____
Question 10 :
k
Key man can pass the train in case of rail breakage, when gap is_____
Question 11 :
The purpose of going as keyman by mate in once in week is____
Question 12 :
The purpose of going as keyman by mate in once in week is____
Question 15 :
For checking of squareness of sleeper, what is the tool used?
Question 16 :
For checking of squareness of sleeper, what is the tool used?
Question 17 :
For packing of sleepers___ cm width of ballast to be opened from inside of rail towards centre
Question 18 :
For packing of sleepers___ cm width of ballast to be opened from inside of rail towards centre
Question 19 :
during the time of protection, while placing the detonator on the rail if the leg of the detonator broken, then how to fix the detonator?
Question 20 :
during the time of protection, while placing the detonator on the rail if the leg of the detonator broken, then how to fix the detonator?
Question 21 :
Showing denger signal with hands in case of availablity of red flag.......
Question 22 :
Showing denger signal with hands in case of availablity of red flag.......
Question 23 :
proceed signal with hands in case of non availability of green Flag....
Question 24 :
proceed signal with hands in case of non availability of green Flag....
Question 25 :
showing proceed with caution hand signal with hands in case of non availability of green Flag.....
Question 26 :
showing proceed with caution hand signal with hands in case of non availability of green Flag.....
Question 27 :
Care should be taken while fish plating combination fish plated joint, otherwise.....will happen.
Question 28 :
What will happen for 60kg fish plated joint, if we use 25kg fish bolts?
Question 29 :
What will happen for 60kg fish plated joint, if we use 25kg fish bolts?
Question 30 :
Track men are responsible for maintenance of track and performing various duties like....
Question 31 :
Track men are responsible for maintenance of track and performing various duties like....
Question 32 :
At work spot during packing, the prime duty of track man is...... while passing of a train.